FIRE FIGHTING
Fire protection is not optional, it’s essential. VPB Infratech offers end-to-end fire detection and suppression systems designed per NBC 2016 and international fire codes. We combine engineering intelligence with field experience to protect lives, property, and business continuity.
Services Include:
- Fire Suppression Systems: Fire hydrants, sprinklers, water curtains, deluge valves, and hose reels.
- Fire Detection & Alarm: Addressable and conventional alarm systems integrated with ELV networks.
- Fire Pumping Systems: Pumproom design, fire pump installation, and system automation.
- Fire Equipment Supply: Extinguisher placement, maintenance, and certification.
- Fire System Engineering: Design documentation, hydraulic calculations, flow testing, and approvals.
Systems provided
- Hydrant & sprinkler networks:Hydraulic design, network installation (wet/dry systems), deluge and water curtain solutions depending on hazard profiles.
- Pump & pumproom installations:Sizing, installation and commissioning of fire pumps, controllers and pumproom architecture for reliable supply.
- Detection & alarm:Integrated fire detection systems, alarm control panels and zone-based layouts that integrate with building ELV and SCADA where required.
- Fire safety equipment:Fire extinguisher selection, placement strategies, and preventive maintenance programs.
- Design & compliance:Fire system engineering based on NBC 2016, correct hydraulic calculations, and statutory compliance documentation.
Operational readiness
- Commissioning tests, flow tests and maintenance schedules to ensure systems work when required.
- Training and handover sessions for site operations teams on alarm response and system management.
Why this matters
A correctly engineered fire-fighting system protects lives and reduces costly asset loss — our work balances technical accuracy with practical operability.
Why VPB for Fire Fighting:
We handle every phase from hydraulic design to final commissioning, ensuring adherence to all safety codes. Our training sessions for client staff and post-installation maintenance ensure systems remain operational for years.


















































